Survey Grade Accuracy
Typically: < 50mm |
Sub-Meter Accuracy
| Typically: |
< 1m X &Y |
| |
< 2m Z |
|
Mapping Accuracy
Typically: < 3m X & Y |
| Easting / Northing & Elevation (XYZ) |
Easting & Northing Only |
Easting & Northing Only |
| High Accuracy Asset Locations, Elevation & Inventories |
Asset Locations & Inventories |
Low accuracy Asset Locations & Inventories |
› Control Points
› Design Surveys
› 'As Built' Surveys
› Land Surveys
› Settlement Surveys
› Reinstatement Surveys
› Borehole locations
› Utility Inventories |
› On Site Data Validation
› Habitat mapping
› Environmental issues
› Bill Board locations
› Vehicle tracking |
› On Site Data Validation |